scarfbd

SCARF

Projects

Our Experience

SCARF Consulting Services has worked about 27 different projects funded by different donor organizations including governments of the respective countries. The firm has diversified field of experience working in almost all development sectors of Bangladesh, most of the donors such as ADB, WB, DFID, UNDP, FAO, JICA, EU, CIDA, USAID, SIDA, IFC, GEF, UNICEF and other bilateral and government financed projects. Being the country’s premium development consultancy firm Firm’s has a wide project experience in home as well as in abroad. A list of general experience of the firm is given below.

RECENT PROJECTS

S.I. Project Name Location Funding Agency Year
1
In-depth Monitoring of the Project “Capacity Building of 64 Technical School and College Under Directorate of Technical Education"
Bangladesh
IMED/DTE
Jan to June
2023
2
Impact Evaluation of “Emergency 2007 Cyclone Recovery and Restoration Project (ECRRP) (BWDB Part) (3rd Revised)” Project” under IMED
Bangladesh
IMED/BWDB
Jan to June 2023
3
DLI (Disbursement Linked Indicator) target 6.2 At least 250,000 new OOSC have enrolled in LCs through ISAs & target 6.3 At least 250,000 new OOSC have enrolled in LCs through ISAs
Bangladesh
IMED/DPE
Dec 2022 to Feb 2023
4
In-depth Monitoring of the Project “Protection of River Bank from the Erosion of Brahmaputra River in Chilmari & Ulipur Upazila of Kurigram District”
Bangladesh
IMED/ Ministry of Planning
2022
5
Conduct in-depth monitoring on the Need-Based Infrastructure Development of Government Primary Schools Project (NBIDGPS)-1st Phase 1
Bangladesh
IMED/ Ministry of Planning
2022
6
Technical Agent (Consulting Firm) for Result Measurement & DLI Verification under Program for Supporting Rural Bridges (SupRB) of Local Government Engineering Department (LGED).
Bangladesh
LGED/IMED Ministry of Planning
Ongoing
7
Consultancy Service for Disbursement Linked Indicator ResultsVerification (Phase-1)
Bangladesh
CEDP, Ministry of Education
2022
8
Impact Evaluation of the Project “Safe Crop Production Project Through Integrated Pest Management (IPM) Approach (1st Revised)”
Bangladesh
IMED/ Ministry of Planning
2021
9
In-Depth Monitoring Study on the project titled “Production, Storage and Distribution of Quality Seeds of Pulses, Oils & Spices at Farmers Level Project-3rd Phase (1st Revised)”
Bangladesh
IMED/ Ministry of Planning
2021
10
Impact Evaluation of the Project “New Dakatia and Old Dakatia-Little Feni River Drainage Project (5th Revised)”
Bangladesh
IMED/ Ministry of Planning
2020
11
In-Depth Monitoring Study on the project titled “Irrigation Management Improvement Project (IMIP)-for Muhuri Irrigation Project (MIP)”
Bangladesh
IMED/ Ministry of Planning
2020
12
Conducting Impact Study on the project “South-west Area Integrated Water Resources Planning and Management Project (3rd Revised)” under IMED
Bangladesh
IMED/ Ministry of Planning
2019
13
Consultancy Services for Assessment of Co-facilitation for Implementing Market Development Interventions in the Forward Market of Selected Agricultural Sectors under SARC
Bangladesh
SARC/Global Fund
2017
14
Impact Evaluation on strength of National Academy for Educational Management (NAEM)
Bangladesh
NAEM /GOB
2019
15
Impact Assessment Survey Rehabilitation Work of Teesta Main Canal and Related Structure Under Command Area of ​​Teesta Barrage-1 stage project
Bangladesh
IMED
2018
16
Factors Influencing e-Procurement Process in Public Sector of Bangladesh National Planning and Development Academy (NAPD), Financed by Ministry of Planning, Planning Commission
Bangladesh
NAPD/Ministry of Planning
2019
17
Dietary Behavior of the Consumers Consuming Street Foods: The Causes and Consequences
Bangladesh
SSRC/Ministry of Planning
2017
18
In-Depth Monitoring of Protection of Brahmaputra River Right Bank at Bairagirhat and Chilmari Bandar area of Chilmari&Upazila in Kurigram District(Phase-2)
Bangladesh
IMED/GOB
2017
19
Health Seeking Behaviour among the Elderly Ethnic Groups in Chittagong Hill Tracts (CHT)
Bangladesh
BSSRC/ Ministry of Planning
2016
20
Role of Social capital Reducing Slum Dweller’s Poverty in Urban Bangladesh
Bangladesh
Ministry of Planning
2016
21
Feasibility Studies and Detail Design (FSDD) of Sub-projects under Small Scale Water Resources Development Project (SSWRDP) in Greater Mymensingh, Sylhet and Faridpur Areas, Package 11, financed by JICA.
Bangladesh
Local Government Engineering Department (LGED)/JICA
2015
22
Monitoring & Evaluation (M&E) on Arsenic Awareness-raising during Screening Activities Being Implemented by BAMWSP in 147 Upazilas (Credit#3124-BD)
Bangladesh
DPHE/ WB
2016
23
Consultancy Services for Detailed Design and Tendering Services (Phase-I) and Construction Supervision Services (Phase-II) for Rehabilitation of Kulaura-Shahbazpur Section of Bangladesh Railway
Bangladesh
Bangladesh Railway/ GoB
2017
24
Impact Assessment of Integrated Agricultural Productivity Project (IAPP) funded by World Bank-Project ID No. P123457
Bangladesh
Ministry of Agriculture/World Bank
2016
25
Mid-term performance evaluation of Catalyzing Clean Energy in Bangladesh (CCEB)_ ICS End-user’s Survey under Accelerating Capacity for Monitoring and Evaluation (ACME) activity USAID Contract No.: AID-388-C-14-00001
Bangladesh
IBTCI/ USA USAID
2016
26
Socio economic Survey for Economic Zones (BEZA: S-21, Lot-2)
Bangladesh
Bangladesh Economic Zone Authority IDA/DFID
2015
27
Construction of Walkway and bank protection on Evicted foreshore land of the river Buriganga, Turag and Sitalakhya (1st Phase)
Bangladesh
BIWTA/ GoB
2016
28
Inventory of M&E data base management systems and associated technology under Accelerating Capacity for Monitoring and Evaluation (ACME) activity USAID Contract No.: AID-388-C-14-00001
Bangladesh
IBTCI/USAID
2015
29
Design, Drawing and Construction & Supervision of Rangpur City Corporation
Bangladesh
LGED/GoB
2014
30
Consultancy Services for Pest Risk Analysis (PRA) for Cucurbits and Citrus Pest in Bangladesh
Bangladesh
DAE
2015
31
Impact Evaluation of School Sanitation Programme
Bangladesh
UNICEF
2015
32
An Evaluation of the Effective Schools Through Enhanced Education Management System
Bangladesh
NGO
2016
33
Impact Evaluation of Effective School Through Enhanced Educational Management Project
Bangladesh
Directorate of Primary Education
2015
34
Assessment of Upazila Resource Centre
Bangladesh
Directorate of Secondary and Higher Education
2015
35
Tracer Study: Development of 16 Govt. Commercial Institutes Project
Bangladesh
Directorate of Secondary and Higher Education
2016
36
Study on Disaster Management (Earthquake)
Bangladesh
JICA
2015
37
Evaluation of the Socio-Economic Development Project for Women
Bangladesh
Department of Women Affairs (GOB)
2015
38
The Impact of Family Planning Program Performance at District and Upazila level
Bangladesh
NGO
2015
39
Study on Establishing an EZ Coordinating Cell in the Bangladesh Board of Investment (BOI)
Bangladesh
IFC
2015
40
Study on IFC-Bangladesh Land Administration Program Diagnostic and Process Review (Study Project)
Bangladesh
IFC
2015
41
Evaluation Study of Hybrid Seed Production and Marketing
Bangladesh
Mintu Trading
2014
S.I. Project Name Location Funding Agency Year
1
In-Depth Monitoring Study on the project titled “Production, Storage and Distribution of Quality Seeds of Pulses, Oils & Spices at Farmers Level Project-3rd Phase (1st Revised)”
IMED/ Ministry of Planning
GOB
2021
2

Impact Evaluation of the Project “Safe Crop Production Project Through Integrated Pest Management (IPM) Approach (1st Revised)”

IMED/ Ministry of Planning
GOB
2021
3

In-Depth Monitoring Study on the project titled “Production, Storage and Distribution of Quality Seeds of Pulses, Oils & Spices at Farmers Level Project-3rd Phase (1st Revised)”

IMED/ Ministry of Planning
GOB
2021
4

Impact Evaluation of the Project “New Dakatia and Old Dakatia-Little Feni River Drainage Project (5th Revised)”

IMED/ Ministry of Planning
GOB
2020
5
In-Depth Monitoring Study on the project titled “Irrigation Management Improvement Project (IMIP)-for Muhuri Irrigation Project (MIP)”
IMED/ Ministry of Planning
GOB
2020
6
Conducting Impact Study on the project “South-west Area Integrated Water Resources Planning and Management Project (3rd Revised)” under IMED
IMED/ Ministry of Planning
GOB
2019
7
Impact Evaluation on strength of National Academy for Educational Management (NAEM)
NAEM
GOB
2019
8
Impact Assessment Survey Rehabilitation Work of Teesta Main Canal and Related Structure Under Command Area of ​​Teesta Barrage-1 stage project
IMED
IMED
2018
9
Factors Influencing e-Procurement Process in Public Sector of Bangladesh National Planning and Development Academy (NAPD), Financed by Ministry of Planning, Planning Commission
NAPD
Ministry of Planning
2019
10
Dietary Behavior of the Consumers Consuming Street Foods: The Causes and Consequences
SSRC
Ministry of Planning
2017
11
In-Depth Monitoring of Protection of Brahmaputra River Right Bank at Bairagirhat and Chilmari Bandar area of Chilmari&Upazila in Kurigram District(Phase-2)
IMED
GOB
2017
12
Health Seeking Behaviour among the Elderly Ethnic Groups in Chittagong Hill Tracts (CHT)
BSSRC
Ministry of Planning
2016
13
Role of Social capital Reducing Slum Dweller’s Poverty in Urban Bangladesh
BSSRC
Ministry of Planning
2016
14
Feasibility Studies and Detail Design (FSDD) of Sub-projects under Small Scale Water Resources Development Project (SSWRDP) in Greater Mymensingh, Sylhet and Faridpur Areas, Package 11, financed by JICA.
Local Government Engineering Department (LGED)
JICA
2015
15

Monitoring & Evaluation (M&E) on Arsenic Awareness-raising during Screening Activities Being Implemented by BAMWSP in 147 Upazilas (Credit#3124-BD)

DPHE
WB
2016
16

Impact Assessment of Integrated Agricultural Productivity Project (IAPP) funded by World Bank-Project ID No. P123457

Ministry of Agriculture
World Bank
2016
17

Mid-term performance evaluation of Catalyzing Clean Energy in Bangladesh (CCEB)_ ICS End-user’s Survey under Accelerating Capacity for Monitoring and Evaluation (ACME) activity USAID Contract No.: AID-388-C-14-00001

IBTCI/ USA
USAID
18
Construction of Walkway and bank protection on Evicted foreshore land of the river Buriganga, Turag and Sitalakhya (1st Phase)
BIWTA
GoB
2016
19
Inventory of M&E data base management systems and associated technology under Accelerating Capacity for Monitoring and Evaluation (ACME) activity USAID Contract No.: AID-388-C-14-00001
IBTCI
USAID
2015
20
Design, Drawing and Construction & Supervision of Rangpur City Corporation
LGED
GoB
2014
21
Consultancy Services for Pest Risk Analysis (PRA) for Cucurbits and Citrus Pest in Bangladesh
Bangladesh
DAE
2015
22
Impact Evaluation of School Sanitation Programme
Bangladesh
UNICEF
2015
23
An Evaluation of the Effective Schools Through Enhanced Education Management System
Bangladesh
NGO
2016
24
25
26

PROJECT: 01

Conducting Impact Study on the project “South-west Area Integrated Water Resources Planning and Management Project (3rd Revised)” under IMED

PROJECT: 02

Impact Evaluation on strength of National Academy for Educational Management (NAEM)

PROJECT: 03

Impact Assessment Survey Rehabilitation Work of Teesta Main Canal and Related Structure Under Command Area of ​​Teesta Barrage-1 stage project

PROJECT: 04

Conducting Impact Study on the project “South-west Area Integrated Water Resources Planning and Management Project (3rd Revised)” under IMED

PROJECT: 05

Impact Evaluation on strength of National Academy for Educational Management (NAEM)

PROJECT: 06

Impact Assessment Survey Rehabilitation Work of Teesta Main Canal and Related Structure Under Command Area of ​​Teesta Barrage-1 stage project

PROJECT: 07

Conducting Impact Study on the project “South-west Area Integrated Water Resources Planning and Management Project (3rd Revised)” under IMED

PROJECT: 08

Impact Evaluation on strength of National Academy for Educational Management (NAEM)

PROJECT: 09

Impact Assessment Survey Rehabilitation Work of Teesta Main Canal and Related Structure Under Command Area of ​​Teesta Barrage-1 stage project

S.I. Project Name Location Funding Agency Year
1
In-depth Monitoring of the Project “Capacity Building of 64 Technical School and College Under Directorate of Technical Education
Bangladesh
IMED/DTE
Jan to June
2023
2
Impact Evaluation of “Emergency 2007 Cyclone Recovery and Restoration Project (ECRRP) (BWDB Part) (3rd Revised)” Project” under IMED
Bangladesh
IMED/BWDB
Jan to June 2023
3
DLI (Disbursement Linked Indicator) target 6.2 At least 250,000 new OOSC have enrolled in LCs through ISAs & target 6.3 At least 250,000 new OOSC have enrolled in LCs through ISAs
Bangladesh
IMED/DPE
Dec 2022 to Feb 2023
4
In-depth Monitoring of the Project “Protection of River Bank from the Erosion of Brahmaputra River in Chilmari & Ulipur Upazila of Kurigram District”
Bangladesh
IMED/ Ministry of Planning
2022
5
Conduct in-depth monitoring on the Need-Based Infrastructure Development of Government Primary Schools Project (NBIDGPS)-1st Phase 1
Bangladesh
IMED/ Ministry of Planning
2022
6
Technical Agent (Consulting Firm) for Result Measurement & DLI Verification under Program for Supporting Rural Bridges (SupRB) of Local Government Engineering Department (LGED).
Bangladesh
LGED/IMED Ministry of Planning
Ongoing
7
Consultancy Service for Disbursement Linked Indicator ResultsVerification (Phase-1)
Bangladesh
CEDP, Ministry of Education
2022
8
Impact Evaluation of the Project “Safe Crop Production Project Through Integrated Pest Management (IPM) Approach (1st Revised)”
Bangladesh
IMED/ Ministry of Planning
2021
9
In-Depth Monitoring Study on the project titled “Production, Storage and Distribution of Quality Seeds of Pulses, Oils & Spices at Farmers Level Project-3rd Phase (1st Revised)”
Bangladesh
IMED/ Ministry of Planning
2021
10

Impact Evaluation of the Project “Safe Crop Production Project Through Integrated Pest Management (IPM) Approach (1st Revised)”

Bangladesh
IMED/ Ministry of Planning
2021
11

In-Depth Monitoring Study on the project titled “Production, Storage and Distribution of Quality Seeds of Pulses, Oils & Spices at Farmers Level Project-3rd Phase (1st Revised)”

Bangladesh
IMED/ Ministry of Planning
2021
12

Impact Evaluation of the Project “New Dakatia and Old Dakatia-Little Feni River Drainage Project (5th Revised)”

Bangladesh
IMED/ Ministry of Planning
2020
13
In-Depth Monitoring Study on the project titled “Irrigation Management Improvement Project (IMIP)-for Muhuri Irrigation Project (MIP)”
Bangladesh
IMED/ Ministry of Planning
2020
14
Conducting Impact Study on the project “South-west Area Integrated Water Resources Planning and Management Project (3rd Revised)” under IMED
Bangladesh
IMED/ Ministry of Planning
2019
15
In-Depth Monitoring Study on the project titled “Production, Storage and Distribution of Quality Seeds of Pulses, Oils & Spices at Farmers Level Project-3rd Phase (1st Revised)”
Bangladesh
NAEM
2019
16
Impact Assessment Survey Rehabilitation Work of Teesta Main Canal and Related Structure Under Command Area of ​​Teesta Barrage-1 stage project
Bangladesh
IMED
2018
17
Factors Influencing e-Procurement Process in Public Sector of Bangladesh National Planning and Development Academy (NAPD), Financed by Ministry of Planning, Planning Commission
NAPD
Ministry of Planning
2019
18
Dietary Behavior of the Consumers Consuming Street Foods: The Causes and Consequences
SSRC
Ministry of Planning
2017
19
In-Depth Monitoring of Protection of Brahmaputra River Right Bank at Bairagirhat and Chilmari Bandar area of Chilmari&Upazila in Kurigram District(Phase-2)
IMED
GOB
2017
20
Health Seeking Behaviour among the Elderly Ethnic Groups in Chittagong Hill Tracts (CHT)
BSSRC
Ministry of Planning
2016
21
Role of Social capital Reducing Slum Dweller’s Poverty in Urban Bangladesh
BSSRC
Ministry of Planning
2016
22
Feasibility Studies and Detail Design (FSDD) of Sub-projects under Small Scale Water Resources Development Project (SSWRDP) in Greater Mymensingh, Sylhet and Faridpur Areas, Package 11, financed by JICA.
Local Government Engineering Department (LGED)
JICA
2015
23

Monitoring & Evaluation (M&E) on Arsenic Awareness-raising during Screening Activities Being Implemented by BAMWSP in 147 Upazilas (Credit#3124-BD)

DPHE
WB
2016
24

Impact Assessment of Integrated Agricultural Productivity Project (IAPP) funded by World Bank-Project ID No. P123457

Ministry of Agriculture
World Bank
2016
25

Mid-term performance evaluation of Catalyzing Clean Energy in Bangladesh (CCEB)_ ICS End-user’s Survey under Accelerating Capacity for Monitoring and Evaluation (ACME) activity USAID Contract No.: AID-388-C-14-00001

IBTCI/ USA
USAID
26
Construction of Walkway and bank protection on Evicted foreshore land of the river Buriganga, Turag and Sitalakhya (1st Phase)
BIWTA
GoB
2016
27
Inventory of M&E data base management systems and associated technology under Accelerating Capacity for Monitoring and Evaluation (ACME) activity USAID Contract No.: AID-388-C-14-00001
IBTCI
USAID
2015
28
Design, Drawing and Construction & Supervision of Rangpur City Corporation
LGED
GoB
2014
29
Consultancy Services for Pest Risk Analysis (PRA) for Cucurbits and Citrus Pest in Bangladesh
Bangladesh
DAE
2015
30
Impact Evaluation of School Sanitation Programme
Bangladesh
UNICEF
2015
31
An Evaluation of the Effective Schools Through Enhanced Education Management System
Bangladesh
NGO
2016
32
33
34